Small tiling repairs: grouping short visits into one day

Cracked tiles, regrouting, resealing a shower: how tile fitters can offer short repair visits online and group them by area without breaking up big jobs.

6 min read

Group small repairs on set days instead of fitting them in wherever a customer asks. Choose one day a week, or a half-day, for repair visits, open short slots only on that day, and let customers book them online. Ask for a photo and whether they have spare tiles before you come. Your big jobs keep their full days, and the small ones stop turning into a phone call, a quote and a half-empty afternoon each.

Why small jobs cost more than they look

A cracked floor tile, a mouldy shower seal, a few loose wall tiles, grout that has crumbled in a kitchen: each one is under two hours of work. But each also means a phone call, a trip, parking, tools unloaded and loaded back, and sometimes a second trip because the replacement tile isn't the right one. Taken one at a time in the middle of the week, they break up days you'd rather give to a bathroom or a floor.

Customers still need them done, and they'll remember who came. A small repair done well today can bring the full bathroom next year. The goal isn't to refuse them, but to take them in a way that doesn't cost you a day.

Setting up repair services

On Book, each service has a name, a price and an optional description shown on your public page. Each slot belongs to one service, with its own start and end. Customers pick a service, then a free slot. With one place per slot, a booked slot is full and disappears from your page.

ServiceExample slotExample price
Replace 1 to 3 cracked tiles1 h 30€120
Reseal shower or bath (silicone)1 h€90
Regrout a splashback2 h€140
Refix loose wall tiles1 h 30€110
Repair assessment visit30 min€40

Lengths and prices are examples: set your own. In each description, say what's included (labour, standard grout or silicone) and what isn't (tiles, which the customer usually supplies for a match). For anything unclear, the assessment visit lets you see the problem before committing to a price.

One repair day, grouped by area

Pick the day that disturbs your big jobs least: a Friday, or a day you'd lose anyway while a screed dries on another site. Create short repair slots on that day only, with travel time between them, and repeat them each week until a date. When a multi-day job needs that day, remove the repair slots of that week before anyone books them.

If you work over a wide area, one option is to alternate: repair slots in one part of your area on the first and third Friday, another part on the others. Book repeats slots weekly on the weekdays you choose, not every other week, so create the alternating days by hand for the weeks ahead. Say in each service description which areas each day covers.

What to ask before you come

  • A photo: sent by message after booking, so you see the damage and the tile.
  • Spare tiles: whether they kept some from the original job; without them, finding a match can take time.
  • Address and access: in the note, with floor and parking.
  • Use of the room: resealed showers and regrouted floors need time before use; say how long in the description.

The public booking form asks for first name, last name, email and phone, plus an optional note that you read in your new-booking email. If the photo shows a bigger problem than the booked service, such as water behind the tiles, call the customer and move the booking to an assessment visit or a longer slot from your bookings list.

After the repair

Customers who book by phone can still be added: pick a free repair slot in your calendar and enter their name; email and phone are optional, and with the email they get a confirmation. Customers can't move bookings online; they contact you, and you reschedule or cancel from your list, then confirm the change yourself, since Book doesn't email them about it. Book doesn't take payments, so say in the description how you're paid on the day.

Book costs €5/month, everything included: unlimited services and bookings, no commission, no contract.

Should I take small tiling repairs at all?
They can bring bigger jobs later. Group them on set days so they don't break up your multi-day work.
How do I stop repairs landing in the middle of a big job?
Open repair slots only on your repair day. When a big job needs that day, remove that week's repair slots before they're booked.
Can I alternate areas each week?
Yes, but create those days by hand: slots repeat weekly on chosen weekdays, not every other week.
What if the repair is bigger than booked?
Call the customer and move the booking to a longer slot or an assessment visit from your bookings list.
Who supplies the replacement tiles?
Say it in the description. The customer's spare tiles are the best match when they have them.

Guides for tile fitters